=
GCB encompasses the following phases:
Line works: :

  • Right of way (ROW), service track and Trenching,
  • Pipe transportation, stringing, bending and welding,
  • Coating, lowering in & crossings,
  • Cathodic protection and hydrostatic testing.

Concentrated works: :

  • Civil works,
  • Piping prefabrication & Assembly,
  • Pre-commissioning & Commissioning.

Galerie photos