Manufacture and assembly on site of 38 scraper stations (HTJ and HTJW project)
SH/EPM
38 Gares racleurs
12 months
Realization of a water storage tank with a capacity of 1000 m3 at the level of Carroubier
NAFTAL
1 Bac de stockage de 1000 m3 + canalisation
14 months
Construction of a water storage tank with a capacity of 2000 m3 at the Hassi Rmel /SH/DP CTH Nord station
SH/DP
1 Bac de stockage de 2000 m3 + canalisation
24 months
Construction of a water storage tank with a capacity of 4000 m3 at the Hassi Rmel /SH/DP CTH Center station
SH/DP
1 Bac de stockage de 4000 m3 + canalisation
24 months
Manufacture and on-site assembly of 34 scraper stations (73-well project)
SH/TRC
34 Gares racleurs
12 months
Manufacture and assembly on site of 2 scraper stations (ROK1 HEH station project)
/
2 Gares racleurs
1 months
Construction of a waste water collection and treatment system TMB
SH/TRC
1 Bac de stockage de 1 500 m3 et 3 538 ML de canalisation de différents diametres.