Title
Client
Scope of works
Deadline

Manufacture and assembly on site of 38 scraper stations (HTJ and HTJW project)

SH/EPM
38 Gares racleurs
12 months

Realization of a water storage tank with a capacity of 1000 m3 at the level of Carroubier

NAFTAL
1 Bac de stockage de 1000 m3 + canalisation
14 months

Construction of a water storage tank with a capacity of 2000 m3 at the Hassi Rmel /SH/DP CTH Nord station

SH/DP
1 Bac de stockage de 2000 m3 + canalisation
24 months

Construction of a water storage tank with a capacity of 4000 m3 at the Hassi Rmel /SH/DP CTH Center station

SH/DP
1 Bac de stockage de 4000 m3 + canalisation
24 months

Manufacture and on-site assembly of 34 scraper stations (73-well project)

SH/TRC
34 Gares racleurs
12 months

Manufacture and assembly on site of 2 scraper stations (ROK1 HEH station project)

/
2 Gares racleurs
1 months

Construction of a waste water collection and treatment system TMB

SH/TRC
1 Bac de stockage de 1 500 m3 et 3 538 ML de canalisation de différents diametres.
36 months
Return to the list of families of current projects