Project title |
Client
|
Scope of works
|
---|
Menzel Ledjment field and earthworks | SH/FCP | 7,160,000 m3earth movement |
Field El Merk, earthworks | HS/AAFC | 5,682,000 m3earth movement |
Temporary installation El Merk | PETROFAC | 1,591,836 m3earth movement |
Extension of the landing strip and construction of a boarding lounge at GASSI TOUIL | SH/DP | 30 X 2000ML |
General earthworks flare area | SA/PEM | 1,473,000 m3earth movement |
Earthworks – Touat Gaz project | TECHNICAS REUNIDAS | 525,451m3earth movement |
Rehabilitation of Roads & TFT Airstrip | SH/TRC | 7,659,878m3of earth movement – Fence wall on 7.450 ML |
Boosting 3 Hassi R’mel – earthworks (SBS, SBC and SBN) | JGC | 800,000m3earth movement |
El Merk Airstrip | HS/AAFC | |
Earthworks and preparation of the site for the HEI Hassi Messaoud crude oil refinery | SH/TRC | 4,810,343 m3earth movement |