ROADS AND HIGHWAYS

Project title
Client
Scope of works
Reinforcement rn 3 over 80 km Illizi – LarachDTP/ILLIZI80km
Stah road networkSH/DP78km
Road rehabilitation between RN°03 – In Amenas airport over 05 kmDTP/ILLIZIDouble track of 05 km
Rehabilitation of the Champ Zarzaitine road networkSH/SINOPEC24km
Rehabilitation of the rn 3 over 25 km Illizi – DjanetDTP/ILLIZI25km
Road works over 40 km in Gassi TouilSH/DP40km
Reinforcement of the RN 03 between Takhamelt and Tiguentourine over 20 kmDTP/ILLIZI20km
Reinforcement rn 53 in cold asphalt between Belagbour and B.Omar Idriss over 40kmDTP/ILLIZI40km
Deviation of road rn03 at Haoud el Hamra.SH/TRC11km
Rehabilitation of the Ikerbane – In Akouet track over 60 kmDTP/ILLIZI60km
Repair of the bf11 track – In Ezzane over 22 kmDTP/ILLIZI22km
Construction of new roads and maintenance of existing roads Berkine group.HS/AAFC70km
Construction of the access road to the Touat oil field (Hassi Ilatou)SH/DPNew 80 km road
Construction works of a main access road, an airstrip and extension and rehabilitation works of the Drina airstrip – Groupement TimimounSH-TOTAL-CEPSANew 120 Km road – New Baroda airstrip – Drina airstrip extension
Rehabilitation of the track in Ezzane- Col Danai over 115 kmDTP/ILLIZI115km
Rehabilitation of the Takisset-Col Danai track over 100 kmDTP/ILLIZI100km
Opening of the Col Danai – BF12 track over 100 kmDTP/ILLIZI100km
Study and construction of the road network for the Tidikelt gas fieldSH/DPNEW ROAD OF 61 Km
Study and realization of the diversion of the omp53 road in Hassi MessaoudSH/DP3.4km
Road repairs linking the Stah field and the western Alrar field over 16 kmSH/DP16km
Lining works for the access to the wells at the level of the Bir Berkine field over a length of 20 kmSH/DP20km
Paving works on roads Zemlet Ennous 15 kmSH/DP15km
Execution of the construction works of the Ain Tsila access roadG. ISARENE84km
Paving works for access to wells and roads in the fields of Hassi Messaoud central areaSH/DP150km
Construction of the Hassi Bahamou access roadSH/EPM150km
Road surfacing works at the Bir Berkine field over a 60 km stretch.SH/DP60km